Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
Data release [made at SA Director of Mines’ discretion] due to licence expiry and pending approval of its subsequent re-grant : Pine Ridge (part of the Central Giles Nickel Project). Annual reports for the period 25/2/1999 to 29/3/2007.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored by Rio Tinto Exploration (RTE) as part of work planned for a larger set of project exploration licences currently...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
Fowler. Annual report plus final report to licence expiry/full surrender, for the period 30/8/1993 to 29/8/1995.
Exploration for nickel, chromium and precious metals, 60 km north-west of Fowlers Bay, comprised ground magnetic and Protem surveys, plus RC drilling (5 holes, total 637 m). No ultramafic intrusive rocks were encountered, and no anomalous downhole...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Hardy (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the eastern end of the Deering Hills in South Australia's Far North-west Aboriginal Lands, approximately 150 km south-west of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as part of...-
Document
Published: 12 Apr 2007
-
Data release [made at SA Director of Mines' discretion] : Hanging Knoll (part of the Central Giles Nickel Project). Annual reports to licence expiry/renewal, for the period 18/3/2002 to 17/3/2007.
A licence area located at the south-eastern end of the Mann Ranges in South Australia's Far North-west Aboriginal Lands, approximately 90 km south-southwest of Ayers Rock (Uluru), is being explored by Rio Tinto Exploration (RTE) and Delta Gold, as...-
Document
Published: 12 Apr 2007
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 2006
-
Thurlga Ramp (part of the Eyre Peninsula Project, Corrobinnie Uranium JV and Thurlga JV periods). Data release : final report at licence expiry/full surrender, for the period 1/1/2013 to 3/5/2019.
During the report period, licensee Andromeda Metals did no on-ground exploration. During its agreed 3-year earn-in period, joint venturer Investigator Resources undertook the following work described herein: - acquisition of high resolution aerial...-
Document
Published: 19 Jul 2019