-
Data release - as updated [made at SA Director of Mines' discretion] : Lock Project. Joint annual reports, for the period 22/4/2014 to 26/10/2018.
Two licences covering the undeveloped Jurassic coal measures of the Lock Coalfield have been taken up to allow initially for conducting research into the current technological and economic prospects for utilisation of the coal. Numerous samples of...-
Document
-
Solar drying of South Australian lignites.
Lignites were leached and dried to test feasibility for use as an auxiliary or start up fuel for a power station. Pilot plant tests indicate solar densified coal may be feasible for a production rate of 100 000 tonnes / annum.-
Document