The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
Stony Hill (part of the Northern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 2/12/2004 to 23/12/2016.
During the life of the subject licence, the focus of exploration was to determine the area's potential for DSO haematite iron ore, with a secondary consideration being magnetite and haematite BIF. After conducting geophysical surveys and exploratory...-
Document
Published: 17 Jan 2017
-
Carpie Puntha and Peterlumbo (part of the Wilcherry Hill Joint Venture Project). Data release made at the third renewal / partial surrender of the latter licence: progress reports and annual reports for the period 14/2/1989 to 30/8/2003. [Index 1 of 2].
Two contiguous areas located south of the Gawler Ranges, between Buckleboo and Franklin Harbour, were taken up primarily to explore the Early Proterozoic metasedimentary sequence for possible Broken Hill type economic stratiform / hydrothermal base...-
Document
Published: 16 Oct 2003