-
Sir Joseph Banks [Island Group]. Progress reports to licence expiry/renewal, for the period 1/8/1965 to 31/7/1966.
As soon as the SA Government restored public access to the subject ground within Spencer Gulf that it had temporarily reserved from the provisions of the State's Mining Act, Kennecott Explorations (Kennecott) took up SML 85 there to evaluate an...-
Document
Published: 06 Sep 1966
-
Spilsby Island. Progress and final reports to licence expiry/full surrender for the period 18/6/1970 to 17/6/1971.
SML 434 was taken out to enable making a re-assessment of the economic potential of exposed molybdenite-scheelite mineralisation first identified along the southern shores of Spilsby Island during 1963. There, outcropping equigranular Lower...-
Document
-
Spilsby Island. Progress reports and final report to licence full surrender, for the period 1/8/1966 to 28/6/1967.
South-westwards inclined diamond drillhole No. 11 was put in to 400 feet total hole depth by licensee Kennecott during the subject reporting period, to investigate the postulated buried inland extension of a continuously mineralised sheet-like body of...-
Document
Published: 31 Oct 1967
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017