-
Wallaroo Bay area. Annual reports to licence expiry for the period 30/5/2002 to 29/5/2004.
Exploration for possible porphyry style Cu-Au-Mo mineralisation or Prominent Hill type copper-gold deposits, associated with the long-recognised North Wallaroo - Alford magnetic and altered red rock trend, has addressed the potential of a 20 km long...-
Document
Published: 27 Sep 2004
-
Data release - as updated : Minlaton South-west, Minlaton, Oaklands and Stansbury (the Yorke Peninsula Project). Annual reports, plus joint final report at remaining licences' respective expiry/full surrender, for the period 21/1/2008 to 10/10/2019.
Phoenix Copper has been exploring several tenement blocks located on western Yorke Peninsula, the prime objective being to discover an economic iron oxide - associated copper-gold-uranium (IOCGU) deposit that may have formed in buried Proterozoic...-
Document
Published: 27 Nov 2019
-
Anna Villa (part of the Alford Project). Annual report and final report to licence full surrender, for the period 20/6/2013 to 16/6/2016.
An area on northern Yorke Peninsula comprising five semicontiguous sub-blocks which are centred ~23 south-southeast of Moonta has been explored for possible buried economic IOCG type mineralisation which could have formed within Palaeoproterozoic or...-
Document
Published: 19 Aug 2016
-
Whiting. First partial surrender report for the period 15/2/2010 to 14/2/2013.
In the vicinity of Weetulta on northern Yorke Peninsula, as part of Minotaur's recent exploration for possible economic buried Moonta or Cloncurry-style IOCG - related base metal massive sulphide mineralisation, 60 line km of airborne VTEM survey data...-
Document
Published: 12 Aug 2013
-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 2017
-
Roopena. Annual reports to licence expiry/full surrender, for the period 31/7/2000 to 26/10/2008.
The 1373 square km Roopena licence area, which lies a short distance inland from Spencer Gulf between Port Augusta and Whyalla, was taken by Aurora Gold to explore for possible economic deposits of gold and copper mineralisation formed within a...-
Document
Published: 22 Oct 2008
-
EL 6105 - Wallaroo Plain area. Annual technical reports for the period 20/02/2018 to expiry 19/02/2023.
EL6105 was granted to Spencer Metals Pty Ltd (ACN) (“Spencer Metals”) on 20 February 2018, the tenement is located approximately 20 km north of Moonta on the Copper Coast, northern Yorke Peninsula and covers approximately 17 square km. The area had...-
Document
Published: 05 Apr 2023
-
Port Hughes. Annual reports and final report to licence full surrender, for the period 29/11/2010 to 17/8/2017.
A licence consisting of three separate small sub-blocks that cover a large number of freehold broad-acre farms in the Bute - Agery - Moonta South district has been explored for possible buried economic IOCG mineralisation, which may have formed on or...-
Document
Published: 31 Aug 2017
-
Data release made in lieu of submitting a final report at the expiry/full surrender on 4/11/2019 of EL 5212/6172 Alford (the last-held licence of the Alford Joint Venture Project) : Project joint annual reports for the period 1/7/2014 to 30/6/2016.
A group of four separate tenements located on northern Yorke Peninsula to the north-east and south-west of the historic Cu-Au producing Moonta-Wallaroo region has been explored for possible economic buried IOCG style mineralisation that may have...-
Document
Published: 01 Sep 2016
-
Data release - as updated [made at SA Director of Mines' discretion] : Moonta - Wallaroo area (the Moonta Project). Annual reports for the period 12/4/2008 to 11/4/2018.
During the 2008-2009 project reporting year (Year 13), Adelaide Resources Limited continued to review all of the past exploration in the Moonta region. This disclosed 190 surface gold anomalies that the company thought warranted further consideration,...-
Document
Published: 10 Jun 2018
-
Ardrossan (part of the Pine Point Project). First partial surrender report at licence renewal, for the period 2/8/2012 to 1/8/2017.
Within the northernmost of two now relinquished portions of the licence area, the only work undertaken was the collection and analysis (by ICP-MS/AES with ultra-trace level methods, following an aqua regia digest) of 380 x minus 180 micron particle...-
Document
Published: 22 Mar 2018