-
PEL 154 Annual Report - Term 2 Year 7.
This report covers the activities carried out in PEL 154 during Term 2 Year 7 for the period 04/07/2018 - 03/07/2019.-
Document
Published: 08 Nov 2019
-
PRL 13 Annual Report - Term 3 Year 5.
This report covers the activities undertaken within PRL 13 during Term 3 Year 4 for the period 31/01/2021 - 30/01/2022.-
Document
Published: 01 Dec 2023
-
GSEL 672 Annual Report - Term 1 Year 3.
This report covers activities undertaken within GSEL 672 during Term 1 Year 2 for the period 14/05/2021 to 13/05/2022.-
Document
Published: 03 Oct 2023
-
GEL 223 Annual Report - Term 3 Year 3.
This report covers the activities undertaken within GEL 223 during Term 3 Year 3 for the period 24 July 2019 to 23 July 2020.-
Document
Published: 13 Aug 2021
-
Beach Energy's proposed onshore Otway Basin petroleum production & processing activities - government consultation comments. 2019.
These government consultation comments cover proposed petroleum production & processing activities in the Otway Basin of South Australia.-
Document
Published: 01 Feb 2019
-
Beach Energy's proposed onshore Otway Basin petroleum production & processing activities - public consultation comments. 2019.
If an activity is deemed by the Department for Energy and Mining (DEM), in consultation with relevant co-regulatory agencies, to be of medium impact according to the criteria for classifying the level of environmental impact of regulated activities...-
Document
Published: 01 Feb 2019
-
GEL 223 Annual Report - Term 3 Year 2.
This report covers the activities undertaken within GEL 223 during Term 3 Year 2 for the period 24 July 2018 to 23 July 2019.-
Document
Published: 16 Dec 2019
-
PPL 21 Annual Report - 2019.
This report covers the activities undertaken in PPL 21 during 2019 (01/01/2019 - 31/12/2019).-
Document
Published: 19 Apr 2021
-
Assessment of Beach Energy's proposed onshore Otway Basin petroleum production & processing activities. October 2019.
Assessment report summarising the main findings in relation to the potential issues and environmental risk associated with petroleum production & processing activities in the Otway Basin of South Australia and in particular how they will be...-
Document
Published: 01 Oct 2019
-
PPLs 62, 168, 202 and PL 19 Annual Report - 2020.
This report covers the activities conducted within PPLs 62, 168, 202 and PL 19 during the 2020 calendar year.-
Document
Published: 09 Mar 2022
-
PPLs 62, 168, 202 and PL 19 Annual Report - 2019.
This report covers the activities conducted within PPLs 62, 168, 202 and PL 19 during the 2019 calendar year.-
Document
Published: 19 Apr 2021
-
Beach, geophysical operations in the Otway Basin, South Australia - environmental impact classification. May 2021.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an environmental impact report relates as either low, medium or high impact activities. This forms the basis of an environmental impact...-
Document
-
Molecular fossils in coastal bitmens from southern Australia: signatures of precursor biota and source rock environments.
Weathered waxy crude oil and black asphaltite (tar) are regularly washed ashore along the coastlines of South Australia and western Victoria. These bitumens generally strand on medium to high-energy, sandy beaches in west or southwest facing bays....-
Document
-
Preliminary Geological Evaluation EPP 18.
On January 13, 1981, the government of the State of South Australia granted to Shoreline Exploration Company Permit EPP18 for hydrocarbon exploration on a 2,000 square mile area covering the northern offshore portion of the Otway Basin. The permit...-
Document
-
Drilling Pad and Access Road Construction on Private Land - Environmental Significance Assessment - Archived.
Section 98 of the Petroleum and Geothermal Energy Act 2000 require the minister to classify the activities to which an Environmental Impact Report (EIR) relates as either low, medium or high impact activities. This forms the basis of an Environmental...-
Document
Published: 01 May 2001
-
GEL 214 Annual Report - Term 2 Year 2.
This report covers the activities conducted in GEL 214 during Term 2 Year 2 for the period 1 November 2014 to 23 October 2015.-
Document
Published: 04 May 2016
-
Drilling Pad and Access Road Construction on Private Land - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 May 2001
-
PEL 255 Region Drilling Activities - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 Jul 2006
-
Limestone Ridge 1 - Statement of Environmental Objectives - Archived.
Section 12 of the Petroleum and Geothermal Energy Regulations 2013 require any person proposing to undertake activities relevant to petroleum exploration to prepare a draft Statement of Environmental Objectives (SEO) prior to exploration commencing....-
Document
Published: 01 May 2001
-
PPL 21 Annual Report - 2014.
This report covers the activities undertaken in PPL 21 during 2014 for the period 01/01/2014 - 31/12/2014.-
Document
Published: 31 Aug 2015