-
RB 2016/00003 South Australian mineral resource production statistics for the six month ended 30 June 2015.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2015, and compares the data with that returned for the previous six...-
Document
Published: 01 Mar 2016
-
RB 2016/00033 South Australian mineral resource production statistics for the six month ended 30 June 2016.
This report presents detailed industry-derived statistics on the State's output and sales values of earth resource commodities realised during the six month period ended 30 June 2016, and compares the data with that returned for the previous six...-
Document
Published: 01 Dec 2016
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-39 - Beach Energy Limited - Murteree Shale, Coalbed Methane and Shale Gas Evaluation Project - new drill core for shale gas resource and deliverability analysis. Drilling final report.
Marsden 1 is located regionally on the eastern edge of the Battunga Trough, approximately 25 km south-west of the Toolachee Gasfield and 22 km east south-east of the Limestone Creek / Biala Oilfield. It was drilled as an exploration well to evaluate...-
Document
Published: 10 Jul 2013