-
Mount Miccollo. Annual reports to licence expiry for the period 9/8/93 to 8/8/95.
Rock chip sampling of Proterozoic hydrothermally much altered ?volcanic basement outcrop in the vicinity of Mt Miccollo, 50 km west-northwest of Iron Knob, returned anomalous Cu, Pb, Zn and As values. A pronounced circular aeromagnetic anomaly,...-
Document
Published: 02 Nov 1995
-
Roopena West. First partial surrender report, for the period 1/10/1993 to 17/12/1996.
Exploration for Stuart Shelf type or Mount Isa Eastern Succession type Fe-oxide associated Cu-Au in the Roopena West area, northeast of Iron Knob, comprised gravity infill, IP surveys and reconnaissance lag sampling. No significant anomalism was...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document
-
Scrubby Peak. Combined first and second annual reports to licence expiry/full surrender, for the period 11/11/2004 to 10/11/2006.
An area situated along the western margin of the Gawler Ranges was taken up by a local landowner to explore for possible economic copper-gold and platinum metal deposits. His initial aerial reconnaissance of surface geological structures was made in...-
Document
-
Mount Glyde. Annual reports and and final report to licence full surrender, for the period 20/11/1992 to 7/8/1995.
Exploration for Olympic Dam and Acropolis - style base and precious metals mineralization, north of Lake Acraman, comprised initial interpretation of SAEI aeromagnetic data plus the conduct of gravity, surface geochemical, ground magnetic, IP and...-
Document
-
Island Lagoon. Progress reports and final report to licence full surrender, for the period 8/12/1980 to 14/9/1982.
Exploration over the now surrendered ground, which had been successively incorporated within ELs 301, 513 and 769, was initially directed at a search for stratabound base metal deposits which might exist within the flat-lying Neoproterozoic and...-
Document
-
Nuckulla Hill. Progress and final reports to licence surrender for the period 1/12/80 to 13/10/81.
A regional geochemical exploration sampling programme of outcrop rock chips (1224 samples) and any incidental stream sediments (39 samples) across an area of the central Gawler Ranges failed to return significantly anomalous results.-
Document
-
Lake Finniss. Annual reports to licence expiry/full surrender, for the period 14/3/2000 to 13/3/2005.
Proterozoic iron oxide - associated Cu-Au deposits of Olympic Dam type, and possible Yilgarn Craton style Archaean Cu-Ni mineralisation in ultramafic rocks, Pt-Cr mineralisation in layered mafic-ultramafic complexes and Cu-Pb-Zn in acid volcanic...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-10, Parkinson Dam epithermal gold-silver mineral prospect. Project interim and final reports.
The Parkinson Dam prospect is located approximately 60 km west of Port Augusta, within Tasman Resources' current Exploration Licence 3307. The company's interest in this locality was kindled in late 2004 during its investigation of recent historical...-
Document
Published: 28 Aug 2006
-
Black Eagle Rock. Annual reports and progress reports plus final report to licence full surrender, for the period 10/1/1997 to April 2001.
Four styles of mineralisation formed the basis for exploration in the Paney-Buckleboo area, namely, stratiform sedex (Broken Hill style), shear-hosted epigenetic gold and base metals (Tunkillia style), skarn-related gold and base metals (Menninnie Dam...-
Document
Published: 30 Mar 2001
-
Nuckulla Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/10/2002 to 28/11/2008.
Exploration for possible buried Ernest Henry or Olympic Dam style copper-gold mineralisation in the Nuckulla Hill area, 120 km north-east of Ceduna, did not progress during the first two years of tenure due to uncertainties in selecting a new remote...-
Document
Published: 22 May 2009
-
Hesso, Bookaloo, Arcoona and Lake Torrens South (the Torrens Project). Annual reports and final reports to project licences' respective sequential full surrender or expiry/full surrender, for the period 23/9/2002 to 18/4/2006.
Olympic Dam or Moonta-Wallaroo style concealed iron-oxide copper-gold mineralisation hosted in Palaeoproterozoic and Mesoproterozoic basement rocks of the Stuart Shelf, and Mount Gunson type younger Neoproterozoic sediment-hosted buried copper...-
Document
Published: 12 Oct 2006
-
Eurilla Dam. Annual reports and final report to licence expiry/full surrender, for the period 16/1/1997 to 15/1/2001.
An area spanning the western margin of Lake Gilles, 50 km north-east of Kimba, was investigated for possible stratiform, shear-hosted, skarn-related and Olympic Dam - style mineralisation. Initial regional calcrete geochemical sampling returned...-
Document
Published: 29 Mar 2001
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 2011
-
Data release - as updated : Lake Harris. Annual reports to licence expiry/full surrender, for the period 15/2/2012 to 14/2/2019.
An area centred ~90 km south-east of Tarcoola and adjacent to the western shore of Lake Gairdner is being explored for possible economic buried Carrapateena or Prominent Hill style IOCG and polymetallic skarn style mineralisation which may be...-
Document
Published: 20 Mar 2019
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
ExpNotes YARDEA: Explanatory Notes YARDEA, SI 53-03.
The YARDEA 1:250,000 scale regional geological map area straddles the southern margin of the Gawler Ranges on northern Eyre Peninsula. The only major township within the area is Minnipa, with Kimba and Wudinna both located immediately south of the...-
Document
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 2018
-
Sloane Hill East. Annual and final reports to licence expiry/full surrender for the period 19/4/2007 to 18/4/2009.
Exploration for possible economic IOCGU mineralisation which was carried out in an area located approximately 22 km south-east of the Prominent Hill mine has consisted of the acquisition of a detailed gravity survey that covered the entire tenement...-
Document
Published: 05 Jun 2009