-
Boolcoomata. Progress report to licence surrender for the period 23/7/1970 to 22/10/1970.
Field checking of 40 of the most prominent aerial radiometric anomalies, recorded in August 1969 in the Outalpa section of former SML 209, did not reveal any uranium mineral occurrences, although 5 of the anomalies showed significant ground...-
Document
-
Larelar Mound. Progress and final reports for period 10/2/1973 to October 1974.
No favourable uranium ore was found in Murnpeowie or Marree Formations.-
Document
Published: 01 Jan 1974
-
Report relating to follow-up work in Jubilee Fault and P-CV areas Nov 1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Hiltaba. Progress and final reports for the period 22/6/1972 to 21/6/1973.
Rock chip and stream sediment samples were analysed for U, Th and base metals. In addition, water samples from bores were analysed for U. All assays were low. It was concluded that the Hiltaba Granite has slightly elevated but insignificant levels...-
Document
Published: 17 Oct 1973
-
Plumbago - Glenorchy area [= Olary 'B' Farmin Block]. Progress and final reports to licence expiry/full surrender for the period 10/2/1972 to 9/2/1973.
In a search for possible remaining economic primary or secondary uranium deposits in an area of known such mineral occurrences located around Mount Victoria, a consultant was engaged by Esso Minerals to conduct detailed 1:12,000 scale geological...-
Document
-
SML 704. Geology of the Jubilee Fault British Empire mine, Aug-Sept 1973 with petrological appendices by Pontifex.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Ifould Lake. Progress and final reports for the period 29/11/1974 to 4/8/1976.
10 reverse circulation holes were drilled, totalling 311 m. Surface radiometric effects were attributed to groundwater Ra and/or Rn, or to evaporitic concentrations of uranium daughter products. Results from drilling and from track etch (alpha)...-
Document