-
EL 6437 Annual Technical Report to period ending 24/11/2020
The Torrens joint venture project covers 818 km2 along the eastern limit of the Gawler Craton in a similar structural setting as the nearby Olympic Dam and Carrapateena deposits. This report outlines exploration undertaken during the period 25/11/2019...-
Document
Published: 24 Feb 2021
- ZIP,
-
EL 6437 Annual Technical Report to period ending 24/11/2021
The Torrens Project is located in the Flinders Ranges of South Australia, approximately 140 km north-west of Port Augusta and 30 km north of Hawker. It sits along the eastern margin of the Gawler Craton at the intersection of the G2 & G8...-
Document
Published: 16 Jan 2022
- TXT,
-
EL 6437 Annual Technical Report to period ending 24/11/2022
The Torrens Project is located in the Flinders Ranges of South Australia, approximately 140 km north-west of Port Augusta and 30 km north of Hawker. It sits along the eastern margin of the Gawler Craton at the intersection of the G2 & G8...-
Document
Published: 16 Jan 2023
-
EL 6421 Annual Technical Report to period ending 28/09/2020
This report is for the period 29th September 2019 to 28th September 2020 and is the first annual technical report for EL 6421 since the expiry of the Northern Eyre Amalgamated Expenditure Agreement. The Uno tenement (EL 6421) is located in the...-
Document
Published: 01 Dec 2020
-
EL 6437 Surrender Report to period ending 09/10/2024
The Torrens Project is located in the Flinders Ranges of South Australia, approximately 140 km north-west of Port Augusta and 30 km north of Hawker. It sits along the eastern margin of the Gawler Craton at the intersection of the G2 & G8...-
Document
Published: 13 Nov 2024
-
EL 6437 Annual Technical Report to period ending 24/11/2023
The Torrens Project is located in the Flinders Ranges of South Australia, approximately 140 km north-west of Port Augusta and 30 km north of Hawker. It sits along the eastern margin of the Gawler Craton at the intersection of the G2 & G8...-
Document
-
EL 6421 Annual Technical Report to period ending 28/09/2022
The Uno tenement (EL 6421) is located in the northern portion of Eyre Peninsula and is approximately 60 km from the township of Kimba. The tenement is considered highly prospective for Menninnie Dam style Pb-Zn-Ag (Cu-Au) mineralisation, both primary...-
Document
Published: 26 Oct 2022
-
EL 6421 Annual Technical Report to period ending 28/09/2021
The Uno tenement (EL 6421) is located in the northern portion of Eyre Peninsula and is approximately 60 km from the township of Kimba. The tenement is considered highly prospective for Menninnie Dam style Pb-Zn-Ag (Cu-Au) mineralisation, both primary...-
Document
Published: 28 Dec 2021
-
EL 6421 Surrender Report to period ending 28/09/2024
This is the Final Technical Report for EL 6421, and describes exploration activities conducted during the reporting period from 29 September 2023 to 28 September 2024. The title was located in the northern part of the Eyre Peninsula, approximately 100...-
Document
Published: 21 Nov 2024
-
EL 6421 Annual Technical Report to period ending 28/09/2023
The Uno tenement (EL 6421) is located in the northern portion of Eyre Peninsula and is approximately 60 km from the township of Kimba. The tenement is considered highly prospective for Menninnie Dam style Pb-Zn-Ag (Cu-Au) mineralisation, both primary...-
Document
Published: 16 Oct 2023