-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
RB 75/00001 Reconnaissance seismic exploration, southwest Arckaringa Basin, South Australia, 1974.
A short programme of seismic exploration was undertaken in the southwest Arckaringa Basin in mid 1974. Shooting was confined mostly to an east-west line over the southwest end of the Tallaringa Trough. An interpretation of the geology of the trough...-
Document
Published: 03 Jan 1975
-
Wilkinson Lakes. Final report at licence expiry/full surrender, for the period 1/11/1975 to 31/10/1976.
Possible shallowly buried, surface-mineable coal formed within the Lower Permian Mount Toondina Formation, and similar to the coal occurring in the Phillipson Trough area, was the target of exploration carried out in the poorly defined Tallaringa...-
Document