-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Ironstone Hill (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 17/9/2003 to 17/9/2015.
During the majority of its tenure term, very little field work was conducted on the subject ground. Initially, office studies of available geophysical and open file geological data were performed during 2005 to try to identify possible drilling...-
Document
-
RB 2012/00019 Geochemistry of pre-1570 Ma mafic magmatism within southern Australia: implications for possible tectonic settings and timing of major mineralisation events in South Australia.
Geochemical and isotopic data from mantle-derived mafic rocks provide important constraints on our understanding of the composition and evolution of the lithosphere through time. Since the lithosphere is sensitive to tectonic processes such as...-
Document
Published: 01 Dec 2012