-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Mount Moseley. Annual and final reports for the period 24/12/96 to 23/12/98.
Exploration targets were gold and base metals in Adelaidean and basement rocks, 20 km southwest of Mount Gunson. Regional and infill calcrete sampling did not reveal any areas worthy of follow up, and geophysical interpretation indicated depths to...-
Document