-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-40, Soyuz gold / copper-gold mineral prospect. Project final report.
Previous exploratory work by Grenfell Resources and Gravity Capital at the Soyuz prospect in the Carnding area, located approximately 25 km west-northwest of Tarcoola, has included ground magnetic, gravity and soil sampling programmes that defined a...-
Document
Published: 15 Jun 1906
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909
-
Talia Hill. Annual reports and final report to licence expiry/full surrender, for the period 19/9/2001 to 25/6/2009.
During the late 1990s, company exploratory drilling of the Harris Greenstone Belt in the central Gawler Craton, south of Tarcoola, revealed a package of previously unknown, shallowly buried komatiite lava beds with a strike length in excess of 350 km...-
Document
-
RB 2009/00016 Compilation of Shrimp U-Pb geochronological data for the Mulgathing Complex, Gawler Craton, South Australia, 2007-2009.
This report book contains SHRIMP zircon U-Pb geochronological data obtained between July 2007 and June 2009, for 10 metasedimentary and meta-igneous rocks from the Mulgathing Complex of the north-estern Gawler Craton. The geochronological study was...-
Document
Published: 01 Aug 2009
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017