-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
Cronje Dam and Oak Bank Outstation (the Cronje Dam Sedimentary Uranium Project). Annual and joint annual reports, plus final report at remaining licence's expiry/full surrender, for the period 20/10/2005 to 1/11/2014.
An area comprised of three separate sub-blocks generally located ~60 km south of Manna Hill and ~70 km south-southeast of Olary has been explored for Tertiary sedimentary uranium which may have formed in buried north to south trending palaeochannels...-
Document
-
RB 2000/00037 Qualco Sunlands groundwater control scheme - Stage 2: QS9 drilling and well testing completion report.
The contract drilling of three production wells, three combined interflow/production wells, three interflow wells, one observation well and seven drainage wells was carried out by Thompson Drilling Company as part of Stage 2 of the Qualco Sunlands...-
Document
Published: 01 Sep 2000