RB 98/00025 Hydrochemistry of groundwaters in the South Australian-Victorian Designated Area - Groundwater Border Agreement Act.
Hydrochemical data from a total of 165 bores along the 40 kilometre wide strip of the South Australian - Victorian Border Designated Area were used to provide a spatial, and temporal, hydrochemical framework of the groundwaters from the three main...-
Document
Published: 01 Jun 1998
-
RB 95/00022 Five year technical review, 1991-1995 - Border (Groundwater Agreement) Act, 1985.
The Groundwater (Border Agreement) Act of 1985 legislated to provide a framework for the joint management of groundwater resources within a 40 km wide strip along the length of the South Australian and Victorian Border, which is referred to as the...-
Document
Published: 01 Jun 1995
-
RB 95/00037 Stonefield bedrock drilling, 1995.
Twenty-three vertical open RC drillholes with a total penetration of 2663 m were drilled by MESA during February and March 1995 along four W-E traverses in the Stonefield area near Truro, to determine bedrock geology and geochemistry below sedimentary...-
Document
Published: 01 May 1997
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
RB 2000/00004 Mallee region groundwater modelling - Report no. 1.
A five-layer finite difference groundwater flow model (MODFLOW) was developed for the Mallee Region to determine the impacts of irrigation on water levels and salinities. The model was calibrated for steady-state conditions over the entire modelled...-
Document
Published: 01 Feb 2000
-
RB 2000/00037 Qualco Sunlands groundwater control scheme - Stage 2: QS9 drilling and well testing completion report.
The contract drilling of three production wells, three combined interflow/production wells, three interflow wells, one observation well and seven drainage wells was carried out by Thompson Drilling Company as part of Stage 2 of the Qualco Sunlands...-
Document
Published: 01 Sep 2000
-
SA/Vic Border Groundwater Review Committee - Five-year technical review, 1996 - 2000.
The Groundwater (Border Agreement) Act of 1985 provides the legislative framework for the joint management of the groundwater resources along the South Australia/Victoria State border. The Act established a 40 km wide Designated Area along the...-
Document
-
Marne River Catchment - Groundwater assessment.
The Marne River is a main tributary catchment for the River Murray, which generates ephemeral flows in wet years. Concerns have been expressed at the construction of large dams in the headwaters of the catchment, about their impacts on streamflow,...-
Document