-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Starvation Lake. Progress reports and final report on regional exploration programme at licence surrender, for the period 13/1/1972 to 31/7/1972.
In a search for possible economic roll-front, blanket style uranium deposits within Tertiary sediments in part of the eastern Frome Embayment, the licensee undertook 1:75,000 scale geological mapping and exploratory auger drilling of the Quaternary...-
Document
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009