-
1973 seismic survey, Tartwaup, final report.
AIM:Previous seismic effort in the Gambier Embayment has consisted mainly of short experimental traverses, and a 'thumper' regional survey. Results obtained were scarcely useable owing to a combination of adverse surface and subsurface factors. After...-
Document
-
1988 seismic survey, Gambier, final report.
AIM: The 1988 Gambier Seismic Survey of semi-detailed and regional data acquisition was shot principally to upgrade the prominent Glenburnie lead in the northeast of PEL 28 into a drillable prospect. This lead, identified 1n 1986 by the Burrungule...-
Document
-
1990 Kongorong (Experimental) Seismic Survey. Final geophysical report.
AIM: To ascertain whether existing seismic data obtained from beneath the Pebble Point Formation could be upgraded so that the primary reservoir, the Waarre Sandstone, might be mapped with a greater degree of confidence in the southern part of the...-
Document