-
Data release - as updated : Maitland (the Yorke Peninsula Copper Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/8/2008 to 24/8/2017.
An area of the western Yorke Peninsula, comprising three separate sub-blocks, was taken up to explore for possible economic buried IOCG-U deposits similar to those at Hillside (located 25 km to the east of sub-block 'B'), Olympic Dam, Prominent Hill...-
Document
Published: 18 Oct 1917
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Data release [made at SA Director of Mines' discretion] : Minlaton, Ardrossan and Ardrossan Coastal Area (the Moonta South Project). Annual and combined annual reports to licences' renewal, for the period 19/4/2002 to 1/8/2008.
Two exploration licences covering most of Yorke Peninsula south of Maitland were taken up by Avoca Resources to allow it to determine the region's potential for having economic basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation...-
Document