-
The Mount Grainger JV Project with Rio Tinto, and the Nackara Arc JV Project with Range River Gold. Progress reports and combined annual reports to the cessation of these joint ventures, for the period 16/6/1999 to 31/1/2006.
The 5 tenements cover 3240km2 of pastoral grazing land centred approximately 45 km northeast of Peterborough within the Orroroo SI54-01 and Olary SI54-02 1:250 000 sheets, in north central South Australia. The Mt Grainger Project Area lies within the...-
Document
-
Mount Michael. Annual report and final report to licence expiry/full surrender, for the period 7/9/1997 to 6/9/1999.
Interpretation of magnetic and gravity data, together with calcrete and MMI sampling, were carried out adjacent to a southerly extension of the Ediacara Fault, 25 km north-west of Parachilna. Low order Pb-Zn-Ag anomalism was located, coincident with...-
Document
Published: 10 Nov 1999