-
Yumbarra (part of Gawler Joint Venture Project). Annual reports to licence expiry/full surrender, for the period 5/1/2000 to 4/1/2003.
A prominent (> 7000 nT), multi-featured, and also geomorphically expressed aeromagnetic anomaly of undoubted prime exploration potential was discovered within the Yumbarra Conservation Park as a result of detailed low level aeromagnetic surveys...-
Document
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 2019
-
Penong B area and Yumbarra (part of the Eucla Basin Project tenement Group 2). Joint final report at licences' joint expiry/full surrender, for the period 16/11/2012 to 15/11/2017.
Two adjoining areas located north of Koonibba were taken up to explore this part of the south-eastern Eucla Basin for possible buried economic marine placer deposits of heavy mineral sands (HM), because they were believed to contain shallow or exposed...-
Document
Published: 12 Sep 2017