-
RB 43/00046 Uranium treatment plant, Port Pirie. Dust sampling, product packing room. 16th August 1956.
Adjustments have been made to the drier so that this now operates according to manufacturer's instructions. Dust concentration, apart from those caused by neglect in operating, appear similar to those found during sampling on the previous visit in...-
Document
Published: 01 Jan 1956
-
RB 43/00079 Uranium treatment plant, Port Pirie. Dust sampling, product packing room 12th September 1956.
In tests carried out on the 12th September 1956, in the Product Room at the Port Pirie Chemical Plant, dust concentrations were found to be excessive, especially in the drum filling area. Further dust suppressive measures are necessary. Product room...-
Document
Published: 01 Jan 1956
-
RB 43/00006 Uranium treatment plant, Port Pirie. Dust sampling, product packing room.
Samples taken at the Chemical Treatment Plant show that dust concentrations in the air of the product packing room, though still too high for safety, show some decided improvement and considerably greater uniformity than when sampled previously.-
Document
Published: 01 Jan 1956
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 2/8/2008 to 1/8/2014.
Rex Mineral’s ('Rex') primary objective in the Pine Point Project area is to determine the potential for economic basement-hosted iron oxide - associated copper-gold mineralisation such as that found at Olympic Dam, Prominent Hill, Ernest Henry and...-
Document