Calca and Poochera (the Streaky Bay Project). Data release made in lieu of submitting a first partial relinquishment report : joint annual reports for the period 22/10/2001 to 13/2/2005.
A multipart licence project area located approximately 100-150 km south-east of Ceduna is being targeted for possible Voiseys Bay type nickel, copper, cobalt and platinum group metal deposits within mafic to ultramafic basement rocks buried beneath...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : West Lake Torrens area. Annual technical report for period ending 29/03/2019.
Exploration licence 5937 is entirely on Lake Torrens, approximately 80 km northeast of Wommera, 100 km southeast of Roxby Downs. In the immediate vicinity of the project area, modern exploration has been conducted since the late 1970’s searching for...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Waddikee. Annual reports for the period 24/5/2010 to 31/1/2018.
During licence Year 6, on renewed EL 4662, Monax and its JV earn-in partner OMM undertook auger soil geochemical sampling, ground magnetic and IP surveys, and exploratory drilling in their continuing search for economic iron ore and manganese...-
Document
-
Project progress report no. 1 on Blinman Copper Project Flinders Ranges, SA. Summary stage I results and diamond drilling proposal.
There is no abstract created for this record-
Document
Published: 01 Jan 1966
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 2018
-
EL 6458 6783 Joint Annual Technical Report to period ending 08/11/2024
This report represents the Final Technical Report for EL 6458 and EL 6783. Originally Tri-Star was targeting coal resources within the Anderson Range Project. This focus shifted in 2021 to uranium conducive to insitu leaching, as well as metalliferous...-
Document
Published: 22 Nov 2024
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1976 to 9/6/1978.
There is no abstract created for this record-
Document
-
EL 6437 Annual Technical Report to period ending 24/11/2020
The Torrens joint venture project covers 818 km2 along the eastern limit of the Gawler Craton in a similar structural setting as the nearby Olympic Dam and Carrapateena deposits. This report outlines exploration undertaken during the period 25/11/2019...-
Document
Published: 24 Feb 2021
- ZIP,
-
Burra Project licence group. Data release made in lieu of submitting partial surrender reports for ELs 6102, 6103, 6158, 6305 and 6306 : joint annual reports for the period 25/1/2018 to 2/12/2020 plus initial annual annual report.
To date exploration in the Burra region of the Adelaide Geosyncline has focussed on historic copper-gold oxide workings, with the aim of delineating further mineralisation along strike, or sulphide mineralisation at depth. Lately however, rather than...-
Document
Published: 04 Feb 2021
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine. Annual reports for the period 13/3/2000 to 1/11/2013.
Exploration Licence 2704 covering 23 square km surrounding the historic abandoned Mutooroo copper mine, located ~55 km east of Olary, was granted to Havilah Resources NL so that the company could assess the economic potential of the remaining sulphide...-
Document
Published: 02 Dec 2013
-
Walparuta Project geophysical program: acquisition and interpretation of high resolution airborne magnetic / radiometric and ground gravity surveys. Final report, Project ADI RD02-264 [part of Accelerated Discovery Initiative Round 2, 2022].
This report details the field acquisition and data processing, inversion and interpretation stages of the Walparuta geophysical program conducted in December 2021. The work was focussed on the Walparuta Project area, located 20 km north of Manna Hill...-
Document
Published: 28 Apr 2022