The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines’ discretion] : Glenside. Annual reports to licence expiry/renewal, for the period 5/12/2005 to 4/12/2010.
An area centred approximately 40 km south of the Andamooka Opal Field and 50 km south-east of the Olympic Dam mine is being explored for possible buried economic Olympic Dam or Prominent Hill type IOCG-U mineralisation as well as for possible...-
Document
Published: 28 Jan 1911
-
Data release made in lieu of submitting a final report at the expiry/full surrender on 4/11/2019 of EL 5212/6172 Alford (the last-held licence of the Alford Joint Venture Project) : Project joint annual reports for the period 1/7/2014 to 30/6/2016.
A group of four separate tenements located on northern Yorke Peninsula to the north-east and south-west of the historic Cu-Au producing Moonta-Wallaroo region has been explored for possible economic buried IOCG style mineralisation that may have...-
Document
Published: 01 Sep 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby Downs, Acropolis South, Parakylia, Roxby Downs North, Hidden Swamp and Roxby Downs (the Theseus Project). Joint annual reports for the period 4/5/2012 to 30/6/2018.
Brownfields exploration for possible buried economic Mesoproterozoic basement-hosted IOCG type mineralisation, so far undertaken by BHP Billiton ('BHPB') within six semi-contiguous licences together covering an area extending from 40 km south to 68 km...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Ardrossan, Minlaton and Ardrossan coast areas (the Pine Point Project). Joint annual reports for the period 19/4/2002 to 1/8/2018.
During the 2014-2015 joint reporting year for the three Pine Point Project licences, as a consequence of the extensive and detailed mine planning feasibility work then being undertaken at Hillside, Rex did not undertake any exploration. A Mining Lease...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : (for 10 exploration licences comprising) the Lake Torrens JV Project. Joint annual reports for the period 1/1/2007 to 31/12/2011.
A group of ten, mainly adjoining licence areas occupying the plains surrounding the northern end of Lake Torrens, are now being jointly explored for possible economic buried Olympic Dam style IOCG related mineralisation that may have formed in the...-