-
Saw Mill. Progress and final reports for the period 22/2/1973 to 22/2/1974.
Investigations included drilling in the eastern part of EL 41, costeaning and close space drilling near Nob Well and Apollonaris anomaly, water well sampling, and ground search for carnotite.-
Document
Published: 01 Jan 1974
-
Chimpering Rock Hole, Lake Tallacootra, Pybung and Chundaria (the BARTON base and precious metals project). Annual reports for the periods 25/7/1992 to 24/7/1994, and 30/12/1994 to 29/12/1996.
In 1993 the SA Government flew a regional aeromagnetic survey over the western Gawler Craton as part of the South Australian Exploration Initiative, which prompted North Ltd to change direction with its BARTON area exploration programme, to address...-
Document
Published: 13 Mar 1997
-
Mount Craig Copper Project. Final report for June to December 2021 geophysical and drilling program, Project ADI RD02-268 [part of Accelerated Discovery Initiative Round 2, 2021].
An area centred ~28 km east of Hawker is being explored for possible buried epigenetic/hydrothermal, skarn style and sediment-hosted stratabound base and precious metals mineralisation that may have formed within prepared Adelaidean metasedimentary...-
Document
Published: 02 Nov 1921
-
Tanner Dam North. Final report at licence full surrender, for the period 22/11/2012 to 26/2/2014.
An area centred approximately 130 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document