-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-35, Mount Woods Inlier, Kangaroo Dam platinoid metals mineral prospect. Project final report.
A programme of five diamond drillholes totalling 1740.6 m has recently been completed on EL 3445 at the Kangaroo Dam prospect, to follow up anomalous platinum and palladium metal values encountered within the Palaeoproterozoic metasedimentary basement...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Joint annual reports for the period 1/1/2008 to 31/12/2010.
In an agreement with Oxiana, Toro Energy Limited has Uranium rights covering the Project area. In 2008, exploration activities within tenements comprising the Mount Woods Project targeted iron oxide copper gold (IOCG) style mineralisation. Drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 3 of 4 ].
During July 2000, the Minotaur Resources Ltd / Billiton Exploration Australia Pty Ltd mineral exploration alliance entity agreed to farm into the four Coober Pedy Project tenements held by Normandy Exploration (80%), Sons of Gwalia (13%) and Sabatica...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 4 of 4 ].
In 2006, work completed on the Prominent Hill Project in the reporting period included drilling of 17 RC holes for 4,255 m and 46 mud/diamond holes at Prominent Hill prospect for 14,301.5 m. The drilling at Prominent Hill intersected wide zones of...-
Document