-
Cronje Dam. Progress reports and final report to licence expiry/full surrender, for the period 21/8/1979 to 29/11/1984.
Continuing exploration for possible hydrothermal or epithermal base metal and precious metal deposits, within an area centred 60 km south-west of Olary, at the outset targeted some previously identified geochemical anomalies, principally via shallow...-
Document
-
Amdel Ltd project - Fluid inclusion studies of South Australian ores, rocks and minerals. Progress reports nos 1 to 6 for the period 7/5/1976 to 3/4/1980.
In September 1975 the South Australian Department of Mines accepted a proposal from Amdel Ltd to purchase and set up some microthermometry apparatus, in order to commence fluid inclusion studies of selected rock types and minerals in South Australia....-
Document
-
Anabama [Copper-Molybdenum Project]. Progress and final reports to licence expiry/renewal, for the period 26/10/1972 to 25/10/1974.
Ongoing exploration by the SA Department of Mines of the copper and molybdenum - mineralised Anabama Granite batholith, which is located 20 km south-east of Manna Hill, has involved detailed geological mapping, soil and rock chip sampling, and the...-
Document
-
ExpNotes OLARY: Explanatory Notes OLARY
There is no abstract created for this record-
Document