-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Ediacara Range. Progress and final reports on evaluation of phosphate prospects, for the period June to November 1975.
Exploration for possible commercial accumulations of sedimentary shallow marine phosphorite ore in the Ediacara 'Sub-basin', 26 km west of Beltana, has consisted of a search within the Early Cambrian strata for any sites or layers of phosphate...-
Document
-
Parachilna, Hookina, Burt Lagoon and Kootaberra (part of the Wilkatana Project). Joint final report at licences' joint full surrender, for the period 26/11/2015 to 18/1/2018.
Following the completion of desktop studies of previous exploration data, and the conduct of a site visit to the Wilkatana Project area, it was decided that the metalliferous mineral prospectivity of basinal sediments underlying the four subject...-
Document
Published: 23 Jan 2018
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-39, Torrens Hinge Zone / Stuart Shelf project area Mississippi Valley type (MVT) mineral prospects. Project final report.
The recent Geoscience Australia - run regional seismic traverse across the Stuart Shelf has revealed the architecture of the buried Neoproterozoic sediments there, and also that of the structures created during the Delamerian inversion. Dewatering of...-
Document
Published: 29 Oct 2007