-
The Mount Grainger JV Project with Rio Tinto, and the Nackara Arc JV Project with Range River Gold. Progress reports and combined annual reports to the cessation of these joint ventures, for the period 16/6/1999 to 31/1/2006.
The 5 tenements cover 3240km2 of pastoral grazing land centred approximately 45 km northeast of Peterborough within the Orroroo SI54-01 and Olary SI54-02 1:250 000 sheets, in north central South Australia. The Mt Grainger Project Area lies within the...-
Document
-
Hallett (part of the Nackara Gold Project). Annual reports and final report to licence expiry/full surrender, for the period 9/8/2002 to 4/10/2012.
An area of high country in the far northern Mount Lofty Ranges was taken under licence to try to find the primary source(s) of widely dispersed detrital gold known from Recent and Tertiary cover sediments in the region, while focussing mainly on...-
Document
-
2003 Mount Grainger region HyMap survey. Mineral maps Data Package.
HyVista Corporation was contracted by DMITRE during August-September 2013 to process an archived set of HyMap airborne hyperspectral scanner data of the Earth's surface radiance properties, that had previously been acquired on 26/2/2003 from a survey...-
Dataset
- ZIP,