-
Mutooroo (Ridge). Annual reports plus final report to licence expiry/full surrender, for the period 23/8/2018 to 22/8/2021.
A very small area centred ~60 km south-east of Olary has been explored for possible economic buried Late Proterozoic sediment-hosted or volcanic hosted massive sulphide (VHMS) Cu (-Co) mineralisation. Previous exploration conducted by Longreach Metals...-
Document
Published: 27 Aug 1921
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Mutooroo Ridge. Progress reports and final report to licence full surrender, for the period 18/4/1977 to 17/4/1978.
Newmont Mining used a ground magnetic survey, an IP survey and a soil geochemical survey to select sites at the Mutooroo Ridge copper prospect for its subsequent drilling during May and October 1977 of 2 inclined, percussion precollared diamond cored...-
Document