-
Data release [made at SA Director of Mines' discretion] : Burra Hill (part of the Burra South Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 1/5/2006 to 30/4/2009.
Within a small licence area centred about 15 km south-south-east of Burra township in the northern Mount Lofty Ranges, Copper Range initially targeted near-surface copper oxide mineralisation associated with an altered and brecciated contact zone...-
Document
-
Oladdie Prospect. First and final progress report for the period 1/7/1968 to 31/12/1968.
Exploration for possible stratabound or hydrothermal copper deposits in an area between Johnburg and Orroroo consisted of detailed 1:12,000 scale geological mapping and a stream sediment geochemical survey. This work failed to locate any copper of...-
Document
Published: 02 Jan 1969