-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Olary (latterly part of the Olary Project). Annual reports and final report to licence full surrender, for the period 21/1/2008 to 20/01/2015.
A large area located immediately south and south-west of Olary has been explored initially for possible economic buried primary epithermal to mesothermal copper-gold and gold only mineralisation that might have formed in Adelaidean and older bedrock,...-
Document
Published: 01 Apr 1915