-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
RB 00864 APIRA Project P298 : Bight - Duntroon Basins Study. Final report
From February 1988 to March 1990, SADME carried out a source rock geochemical analysis and palynological re-evaluation of offshore petroleum exploration well samples, and also did the final processing of 778 km of offshore seismic data that had been...-
Document
Published: 01 Jan 1991