-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 19 - Musgrave Project area, SkyTEM helicopter-borne electromagnetic survey. Project PT1-19 final report.
To assist with exploration for possible buried magmatic massive copper-nickel sulphide deposits in Proterozoic Giles Complex ultramafic intrusions within the central Musgrave Province, and to simultaneously provide useful geophysical data for mapping...-
Document
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012