-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
RB 2013/00006 SHRIMP U-Pb geochronology of the Tieyon (5645) 1:100 000 mapsheet.
This report presents SHRIMP U-Pb zircon geochronology results for 21 samples from the Musgrave Province, South Australia, acquired over the period 2007-2012 as part of the Tieyon 1:100 000 mapsheet (5645) mapping program. Some of the work (done on all...-
Document
Published: 01 Jun 2013