-
AMIRA Project P544: Proterozoic sediment-hosted copper deposits. Quarterly progress reports and final report for the period July 2000 to October 2003.
The original objectives of this project were: 1) To understand the processes responsible for transporting, concentrating and fixing copper and other ore constituents during sedimentary basin evolution 2) To document the various stages and paragenesis...-
Document
-
Witchelina. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 21/10/1991 to 20/10/1995.
Exploration for structurally controlled Cu mineralisation near Witchelina Homestead and Breaden Hill, 20 km south-west of Marree, comprised detailed geological mapping of prospect areas, soil and rock chip geochemical sampling of gossans and of...-
Document