Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Wilkinson Lakes East. Annual reports plus final report to licence full surrender, for the period 3/5/2010 to 6/2/2015.
An area centred ~150 km west of Coober Pedy, that is located mostly north-west of and that also has a small part lying immediately south-east of the Karari Fault, a major crustal structure which has controlled deposition at the southern limit of the...-
Document
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010