-
EPP 25 surrender report.
There is no abstract created for this record-
Document
-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
1991 marine seismic survey, DH91, final report.
AIM: The DH91 seismic survey programme was designed to provide new 2D coverage of potential prospects and leads in an offshore area with very little modern seismic data, especially in the southeastern part of the permit. Complementary 1983 and 1984...-
Document
-
Sensitivity analysis, [seismic] line DH91-131 2-D modelling, Duntroon Basin.
There is no abstract created for this record-
Document
Published: 12 Aug 1996
-
EPP 26, Duntroon Basin. Rocky prospect review.
There is no abstract created for this record-
Document
Published: 29 Jul 1996