-
Anabama North and Anabama (the Anabama JV Project). Data release made at licences' joint full surrender: joint annual reports for the period 1/5/2008 to 18/12/2014.
An area centred ~50 km south-east of Manna Hill township on the Barrier Highway was taken up to explore for possible economic buried epithermal, VHMS style copper-gold or other base and precious metal mineralisation which could have formed within...-
Document
-
Cronje Dam. Progress reports to licence expiry/renewal, for the period 20/4/1977 to 19/4/1979.
Exploration for possible concealed volcanogenic massive sulphide (VHMS) base metal mineralisation associated with the Mesoproterozoic Boucaut Volcanics has included the acquisition and assaying of 1200 soil samples, traverse drilling of 224 shallow...-
Document