RB 44/00063 Myponga Dam Project - Geological investigation of the tunnel route on the proposed pipeline from the reservoir.
Detailed geological examination of the area in the vicinity of the proposed tunnel has shown that, provided suitable precautions are taken, there are no geological factors which will prevent the successful construction of a tunnel through the ridge...-
Document
Published: 02 May 1957
-
RB 47/00116 Geological investigations, Myponga Dam construction phase report no. 2.
Further geological investigations at the dam site, particularly on the left bank, have delineated the width of limestone present and by means of an exploratory adit have shown that solution cavities are relatively rare. Cavities are of two types;...-
Document
Published: 01 Jan 1958