-
Data release - as updated [made at SA Director of Mines' discretion] : Bonython Hill (part of the Border Project). Annual reports for the period 23/2/2007 to 18/5/2014.
During Year 7 of reporting, exploration work included two 1 km soil geochemical traverses, field inspection of Neogene palaeochannels and land access negotiations with landowners. Previous exploration in the region has recognised the correlation...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bonython Hill. Annual reports for the period 11/1/2001 to 22/2/2007.
A complicated basement sequence comprising Palaeoproterozoic Willyama Supergroup metasediments, intrusive igneous rocks and volcanic rocks, plus Mesoproterozoic granitoids and associated mafic dykes, which occupy the south-western corner of the Broken...-
Document
Published: 25 May 1907
-
Data release [made at SA Director of Mines' discretion] : Mutooroo. Annual reports to licence expiry/renewal, for the period 16/1/1997 to 2/4/2007. [ Index Part 1 of 2 ].
Palaeoproterozoic Willyama Supergroup metasediments, intrusive igneous rocks and volcanic rocks, plus Mesoproterozoic granitoids and associated mafic dykes, which occupy the south-western corner of the Broken Hill basement domain in an area centred...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mutooroo West. Annual reports for the period 15/11/2005 to 14/11/2009.
There is no abstract created for this record-
Document
Published: 26 Nov 1909