-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-14 - Mingary Station, Broken Hill Domain, Palaeoproterozoic lode style stratabound hydrothermal Au-Cu-Ag prospects. Drilling interim and final reports.
During 2014, Minotaur Exploration successfully applied for a PACE 2015 collaborative drilling subsidy grant to help it undertake drill testing of the inferred extension within its current tenement EL 4844 Mingary of the quartzite lode horizon present...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Kalabity. Annual reports and final report to licence expiry/full surrender, for the period 18/11/2000 to 28/3/2014.
An area situated ~100 km west of Broken Hill has been explored for buried base and precious metals epigenetic mineralisation that might have formed within Palaeoproterozoic meta-igneous and metasedimentary basement rocks of the north-eastern Olary...-
Document