PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Data release - as updated : Nicholson Hill and Welbourn Hill. Joint annual reports plus separate final reports to respective licence's expiry/full surrender, for the period 15/1/2008 to 14/1/2017.
Possible buried Proterozoic IOCG-U deposits that may have formed in two small licence areas located ~50 to 65 km east of Marla were the targets of renewed exploration, based on a re-interpretation of existing regional geophysical data. It had been...-
Document
Published: 13 Feb 1917
-
Bopeechee and Cadnia Hill/Stuart Creek and Porter Hill (The Lake Torrens Project). Data release made at two licences' surrender/two latter licences' fifth partial relinquishment: annual reports and final reports for the period 9/4/1998 to 31/12/2006.
The reports comprising this data release package describe exploration for economic deposits of base and precious metals that have possibly formed within Neoproterozoic metasediments, the underlying Palaeoproterozoic basement, and in Cambrian carbonate...-
Document
Published: 29 Sep 1909
-
RB 2010/00002 GOMA basement drilling program, northern Gawler Craton.
The GOMA basement drilling program was named after the Gawler-Officer-Musgrave-Amadeus deep seismic reflection survey line, that was completed in 2008 by Geoscience Australia (GA) as part of its Onshore Energy Security Program. Funding for the seismic...-
Document
Published: 01 Feb 2010