-
Data release [made at SA Director of Mines' discretion] : Hedley Hill. Annual reports submitted until the commencement of joint reporting for the six Lake Torrens Project licences, for the period 26/5/1997 to 25/5/2000.
Exploration Licence 2340 “Hedley Hill” is located adjacent to the northeast extremity of Lake Torrens. During the 80’s and 90’s exploration of the Lake Torrens district has had the prime objective of the discovery of an "Olympic Dam" style deposit...-
Document
Published: 20 Jul 1900
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
Ediacara. Annual and final reports to licence expiry, for the period 14/7/1992 to 13/7/1997.
Possible Century or Neves-Corvo style stratabound and barite - associated, thinly bedded lead-zinc-copper sulphide/sulphate mineralisation existing in Late Precambrian to Lower Palaeozoic marine sediments of the Adelaide Geosyncline, was the target of...-
Document
Published: 14 Apr 1999
-
Beltana. Progress reports to licence expiry/renewal for the period 13/11/1969 to 12/11/1971.
Shallowly buried, Cambrian stratabound base metal deposits of Mississippi Valley type, that might be associated with large throw old fault structures running along the western side of the Flinders Ranges, were sought by carrying out a varied programme...-
Document