-
RB 80/00116 Mesozoic stratigraphy of the Frome Embayment.
This study covers a southern lobe of the Eromanga Basin known as the Frome Embayment, which extends W-E from the Flinders Ranges to the Barrier Ranges, and southwards from the vicinity of Moolowatana Station to the Scott Hill-Mundaerno Hill region....-
Document
Published: 01 Feb 1980
-
RB 00755 Palaeontological examination of cuttings from Delhi - Santos' Lake Frome nos 1 and 2 wells.
As requested by Delhi Australian Petroleum Ltd, we have examined cuttings from Lake Frome No.1 and No.2 for microfossil remains. The wells are located in the Frome Embayment at Lat. 3 1 °03'25"S, Long. 1 39°51'52"E and Lat. 31°02'54.5"S , Long....-
Document
Published: 01 Nov 1900
-
Data release - as updated [made at SA Director of Mines’ discretion] : Wooltana. Annual reports for the period 8/8/1997 to 23/9/2009.
Exploration for possible economic buried sedimentary uranium mineralisation within a large portion of the north-western Frome Embayment located immediately south of the Beverley uranium deposit and covering the southern end of the Poontana Sub-basin,...-
Document
Published: 23 Nov 2009
-
RB 2018/00001 Regolith hand specimen atlas for South Australia
This regolith material hand specimen atlas displays 246 images of 212 regolith samples which have been collected over the last 30 years by the authors, present and past Geological Survey of South Australia (GSSA) staff and members of the Cooperative...-
Document
Published: 01 May 2018
-
Data release [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports and technical reports to licence expiry/renewal, for the period 29/8/1992 to 28/9/2009.
In the reporting period to 30th June 1995 for Exploration Licence 1944, Heathgate Pty Ltd completed no fieldwork, however geological evaluation work was undertaken. This work consisted of laboratory testing of drill core from a 1991 drilling program...-
Document
Published: 18 Jun 2010
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 2015