-
RB 80/00035 Stuart Highway, Pimba to Baker Well section. Drilling for construction water.
Of 16 wells drilled, only 6 have an adequate supply of saline groundwater for construction use. On the western part of the section, 4 wells into the deeper fractured rock aquifer were dry. Subsequently another 8 randomly sited wells were drilled into...-
Document
Published: 01 Mar 1980