-
RB 74/00004 Baltic wharf silo site, Port Pirie. Report on foundation investigation - SA Cooperative Bulk Handling Ltd.
Seven cable tool holes have been drilled to investigate foundation conditions for new silos at the Port Pirie Grain Terminal. The drilling penetrated a succession of unconsolidated sediments which showed some lateral variation. From 0 to 12 metres...-
Document
Published: 01 Jan 1974
-
RB 76/00036 Engineering soils survey, Stuart Highway, Coober Pedy area. Four Mile diggings to vermin-proof fence.
A series of 67 backhoe pits, excavated over a distance of 40km along one of the proposed routes of the new Stuart Highway northwest from Coober Pedy has indicated that the following materials are present: • An expansive clay (Callabonna Clay) up to...-
Document
Published: 16 Mar 1976