-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-24, M1 oreshoot deep exploratory diamond drilling, Challenger mine area. Project final report.
Dominion Gold Operations applied for PACE Initiative Year 2 funding from PIRSA in 2005 to assist with the drilling of a deep diamond hole at its Challenger gold mine. The hole 'Wildcat 2' (05CDDH0072) aimed to test for the continuation of the M1 ore...-
Document
-
Comet Project. Final report, Project ADI RD02-279 [Accelerated Discovery Initiative Round 2, 2022].
The Comet Project comprises 3 granted tenements and one Application Area. The Proof-of-Concept Study was limited to work undertaken on EL 6443 (Comet) and EL 6633 (Gina). The project area is centred ~85 km south-southwest of Coober Pedy within the...-
Document
-
RB 2020/00012 Gawler Craton Airborne Geophysical Survey Region 8A, Coober Pedy West – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- PDF,
- ZIP
-
RB 2020/00011 Gawler Craton Airborne Geophysical Survey Region 1B, Tallaringa South – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- ZIP,