-
Barton West and Barton East (initially part of the Gawler Joint Venture Project). Data release made in lieu of submitting a third partial surrender report for the latter licence : joint annual reports for the period 14/3/2001 to 11/1/2011.
The trigger event causing this data release to be made is that three portions of licence ground that together cover ~289 square km or 19.5% of the former area of EL 4217 Barton East have now been relinquished, as of 11/1/2011. No corresponding partial...-
Document
Published: 09 Mar 1911
-
RB 2010/00015 Constraints on the timing of brittle faulting at [the] Challenger Mine.
The orebody at the Challenger gold mine shows remarkable down-plunge continuity, from the surface to some 1400 m vertical depth, which is geometrically equivalent to a down-plunge length of ~2800 m. However, at ~220 RL within the mine, the orebody is...-
Document
Published: 01 Aug 2010