Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
RB 2010/00015 Constraints on the timing of brittle faulting at [the] Challenger Mine.
The orebody at the Challenger gold mine shows remarkable down-plunge continuity, from the surface to some 1400 m vertical depth, which is geometrically equivalent to a down-plunge length of ~2800 m. However, at ~220 RL within the mine, the orebody is...-
Document
Published: 01 Aug 2010